Monday 2 January 2017

Another layer on the floor

Today was a short work day on the trailer!
Just because it was so windy that it could be dangerous to work outside. So, David trimmed the last edges on the OSB boards and put the last layer of plastic on top of the boards.
This will prevent the humidity to enter.

Last layer of plastic.

We had a visit from a friend. Floris that is part of the "Vida em Transição" project came to see the progress of the house.

David showing how high the house is going to be in the highest point.

We are hoping to start tomorrow with one part of the wall frame.

Raquel